top of page
Module GUI for NOC engineer
Explore the flow
Before moving the cables, verify technician has labeled the cables connected to the existing Cisco 3850/9300 switches VCP
Send action to the site tech confirmed
This confirmation is given when the technician performs the action and confirms it.
Action 2 - Validate ports are connected using CLI
### show eth table | except ae.0
Go to the MIST portal and capture the CLI status of the cli eth table.
Paste here and send to SNow
bottom of page