Module GUI for NOC engineer

Explore the flow

 

Before moving the cables, verify technician has labeled the cables connected to the existing Cisco 3850/9300 switches VCP

Check if completed

Send action to the site tech confirmed

 
 
Check if Site Tech complete

This confirmation is given when the technician performs the action and confirms it.

 
 

Action 2 - Validate ports are connected using CLI

### show eth table | except ae.0

 
 
Check if completed

Go to the MIST portal and capture the CLI status of the cli eth table.

Paste here and send to SNow

 
 